summaryrefslogtreecommitdiff
path: root/doc
diff options
context:
space:
mode:
Diffstat (limited to 'doc')
-rw-r--r--doc/plugins/calendar/discussion.mdwn2
1 files changed, 1 insertions, 1 deletions
diff --git a/doc/plugins/calendar/discussion.mdwn b/doc/plugins/calendar/discussion.mdwn
index 49826e4d9..9d57b7a1e 100644
--- a/doc/plugins/calendar/discussion.mdwn
+++ b/doc/plugins/calendar/discussion.mdwn
@@ -3,4 +3,4 @@ matching pages on a given date in some inline type way. --[[DavidBremner]]
Is it possible to get the calendar to link to pages based not on their timestamp (as I understand that it does now, or have I misunderstood this?) and instead on for example their location in a directory hierarchy. That way the calendar could be used as a planning / timeline device which I think would be great. --[[Alexander]]
-I would like the ability to specify relative previous months. This way I could have a sidebar with the last three months by specifying no month, then 'month="-1"' and 'month="-2"'. Negative numbers for the month would otherwise be invalid, so this shouldn't produce any conflicts with expected behavior. (Right?) -- [[StevneBlack]]
+I would like the ability to specify relative previous months. This way I could have a sidebar with the last three months by specifying no month, then 'month="-1"' and 'month="-2"'. Negative numbers for the month would otherwise be invalid, so this shouldn't produce any conflicts with expected behavior. (Right?) -- [[StevenBlack]]